The TIBR change-order workflow

The TIBR change-order workflow ------------------------------
  1. Create a new Change Order from your original quote (keeps lineage).
  2. Paste the delta prompt: scope added/removed, quantities, access, schedule impact.
  3. Add unit rates and allowances for unknowns; surface risks.
  4. Generate branded CO with change log (before/after + rationale).
  5. Share for e-approval; lock validity to materials exposure.
Andrew Harris

Andrew Harris

Andrew Harris has 24+ years of international experience in construction, design, and sales. He has led thousands of site surveys across North America, collaborated with world-renowned architects and designers, and specializes in estimating, architectural consulting, and large-scale renovation projects.