Decode the RFQ package

Manufacturing RFQ to Quote: Turning a BOM into a Winning Proposal

In manufacturing, the journey from receiving a request for quotation (RFQ) to submitting a professional quote is filled with details that determine profitability and credibility. A well-prepared bill of materials (BOM), combined with clear assumptions, quality requirements, and structured pricing, sets the foundation for successful bids. This guide explains how to decode RFQ packages, structure quotes that resonate with buyers, and leverage tools like TIBR to streamline the process.

Decode the RFQ Package

An RFQ is more than just a list of parts. It often contains critical specifications, revision levels, and compliance requirements that must be understood before pricing. Missing these details can lead to underbidding, nonconformance, or disputes down the line.

Check BOM Completeness

The bill of materials (BOM) should be reviewed for completeness and accuracy. Verify revision numbers, dimensions, tolerances, and specified finishes. Pay attention to whether the BOM references sub-assemblies or related drawings, as missing details can cause costly surprises during production.

Understand Special Processes

Some parts require special processes such as heat treatment, plating, welding, or painting. Others demand certifications like ISO, ITAR, or PPAP (Production Part Approval Process). These requirements affect vendor selection, lead time, and cost, and must be priced correctly to avoid margin erosion.

Define the Inspection Plan

Quality expectations should be documented in advance. Confirm inspection requirements such as sample sizes, gauge R&R studies, or statistical process control. Certificates of Conformance (CoC) and Certificates of Analysis (CoA) should also be included in your assumptions to avoid scope gaps.

Quote Structure That Wins Business

A winning quote does more than present a single price. It separates costs, clarifies options, and demonstrates that you’ve anticipated the buyer’s concerns. This transparency builds trust and helps you stand out from commodity competitors.

Separate Costs Clearly

Break out non-recurring engineering (NRE) charges, tooling costs, setup fees, and per-unit pricing. This approach shows the client where upfront investment lies versus recurring production costs, making the proposal easier to justify internally.

Provide Lead-Time Options

Buyers value choice. Offering standard lead times alongside expedited options—with clear premiums—positions you as responsive and flexible. This can win contracts even if your base price isn’t the lowest.

Don’t Forget Packaging and Freight

Logistics play a big role in total cost. Spell out packaging specifications, shipping modes, and Incoterms (FOB, CIF, DDP, etc.). Clarifying responsibilities for freight and risk transfer prevents costly misunderstandings at delivery.

TIBR Advantages in Manufacturing Quotes

Modern quoting platforms like TIBR help manufacturers streamline the process of turning RFQs into structured, professional proposals. By embedding industry best practices into templates and workflows, TIBR reduces errors and increases win rates.

Templates for Tolerances and QC

TIBR includes templates that prompt estimators to capture critical tolerances, finishes, and quality control steps during quote preparation. This ensures important details are never overlooked.

Alternates for Price Breaks and Expedites

TIBR allows you to create alternates within the same quote—such as different price breaks for higher order quantities or expedited production schedules. This gives buyers options without requiring multiple disconnected proposals.

Versioned Quotes with Change Logs

With TIBR, every revision of a quote is automatically versioned with a clean change log. This transparency eliminates confusion about which version is current and makes it easy to track adjustments requested by the buyer.

Best Practices for RFQ-to-Quote Success

  • Verify BOM completeness, revision levels, tolerances, and finishes.
  • Capture all special process and certification requirements early.
  • Document inspection requirements, including sample sizes and certificates.
  • Break out NRE, tooling, setup, and unit costs for clarity.
  • Offer lead-time options and expedite pricing to stand out.
  • Specify packaging, freight responsibilities, and Incoterms.
  • Leverage tools like TIBR for structured, transparent, and versioned proposals.

Conclusion: Turn Complexity into Clarity

Manufacturing RFQs can be complex, but they don’t have to be overwhelming. By decoding BOM details, structuring quotes for transparency, and using tools like TIBR to automate quality checks and change tracking, you can turn every RFQ into a competitive advantage. The result is faster quotes, higher win rates, and stronger client relationships built on clarity and trust.

Andrew Harris

Andrew Harris

Andrew Harris has 24+ years of international experience in construction, design, and sales. He has led thousands of site surveys across North America, collaborated with world-renowned architects and designers, and specializes in estimating, architectural consulting, and large-scale renovation projects.

See Andrew on LinkedIn
Headshot of Andrew Harris

We use essential cookies to make our site work. With your consent, we also use analytics and marketing cookies to improve your experience. You can manage your choices any time.